LSM launch · high throughput

Launch Roller Coaster

No lift hill, no slow climb — the launch is the show.

A launched coaster replaces the lift with an acceleration section. It removes the climb from the cycle, which shortens the ride time per guest and changes the queue dynamics completely.

Launch runStraight section required ahead of the first element
PowerLaunch systems draw peak power — substation sizing is part of the design
FootprintOften narrower than a lift coaster of the same speed
FoundationLaunch section foundations carry different loads than the rest of the track
Launch Roller Coaster — ZhipaoRides
Launch Roller Coaster
Safe & ReliableDesigned to the standards your market requires
Custom LayoutDrawn for your plot and clearance envelope
In-house BuildTrack, structure and train built in our plant
Export & ShippingDocuments, container planning, delivery to port
CommissioningInstall supervision, testing and operator training
01

Is this the right ride for your site?

Four conditions. If you cannot tick at least three, a different model will serve you better.

  • You want a ride that reads as modern on a poster, not a traditional lift coaster
  • Throughput matters more than ride duration
  • Your site has a long straight available for the launch section
  • Your electrical supply can support the launch power draw
02

Site requirements

What has to be true about the ground and the supply before a layout is drawn.

01Launch runStraight section required ahead of the first element
02PowerLaunch systems draw peak power — substation sizing is part of the design
03FootprintOften narrower than a lift coaster of the same speed
04FoundationLaunch section foundations carry different loads than the rest of the track
05AccessLaunch area needs restricted-access planning
01Track length650 m
02Max speed85 km/h
03Total height31 m
04Track height26.5 m
05Riders per cycle20
06Ride cycle time200 s
07Footprintapprox. 5310 m² (max 135 m × 52 m)
08Installed power600 kVA
03

From deposit to opening day

Indicative programme. Your date is set by foundations and permitting, not by fabrication.

  1. Layout & launch specification4–8 weeksPower study runs in parallel
  2. Fabrication16–22 weeksLaunch hardware has the longest lead time
  3. Shipping4–8 weeksLaunch components ship separately
  4. Installation & commissioning10–14 weeksLaunch tuning is the critical path

Capital band: flagship thrill

The launch system is the cost driver, not the track length. Two layouts with the same track length can differ substantially if one is launched and the other is not.

04

In service and in production

Factory photographs and finished installations.

05

Questions buyers ask first

01Is a launch coaster harder to maintain than a lift coaster?

It is different rather than harder. The launch hardware adds a maintenance discipline — power electronics, sensors, brake timing — while removing the lift chain and its wear items.

02How much power does the launch need?

It depends on train mass and target speed, and it is one of the first things we model. The figure is confirmed with your electrical engineer before design freeze.

03Can a launch coaster run in rain?

Operation limits are set with your market standards and confirmed in the operating manual. Launch systems are generally more sensitive to surface conditions than lift coasters, which is a policy decision you set before opening.